Proudly serving Ocoee, FL
Free estimate in Ocoee
We’ll call to schedule your free on-site measure. No pressure.
Ocoee Fencing
Ocoee runs from the older streets around Starke Lake, Bill Breeze Park and the Withers-Maguire House on Oakland Avenue out to newer subdivisions near SR 429 and SR 50. Westyn Bay, Wesmere and Remington Oaks are HOA or deed-restricted communities, and newer master-planned subdivisions often include conservation or drainage easements.
Those easements matter for a fence. The city bars fences from conservation easements and requires 4 inches of clearance where a fence crosses a drainage easement. As a fence company in Ocoee, FL, we mark those lines from your survey, plan corner lots to the city’s sight-triangle rule and prepare the drawings your HOA asks for.
Our Services
New wood, vinyl, aluminum and chain link fences built to your layout, HOA and permit.
We tear out the old fence, haul it away and rebuild on the same line.
Aluminum pool barriers with self-closing, self-latching gates, built to Florida code.
Wood and vinyl privacy fences that close in the backyard and block sightlines.
Walk gates and double drive gates matched to your fence.
Already have a fence we installed? Call the crew that built it for posts, gates and storm fixes.
Also from our crew: HOA fence installation for planned communities, pet fences that keep dogs in, fence removal and commercial fence installation.
Fence Types
Most HOA neighborhoods here end up with vinyl for privacy and aluminum around pools. Here’s the short version; each material has its own page.
Ocoee Fence Rules
Permits, HOAs and property lines catch a lot of homeowners out here. We sort them out before the first post goes in.
Ocoee requires a fence permit for replacements and new installations. The application includes a site plan with fence location, length, height, gates and material, plus the city’s Fence Placement Compliance Acknowledgment. We handle the permit.
4 ft maximum within the front yard setback, which is 25 ft minimum or the building setback. Behind the front of the house, side and rear fences may reach 6 ft.
On corner lots, fences in the street-side setback are limited to 4 ft. Any fence taller than 2 ft 6 in needs a 25 ft line-of-sight triangle at the street corner. We lay out corner lots to that rule before ordering material.
Westyn Bay, Wesmere and Remington Oaks are HOA or deed-restricted communities with their own fence standards. The city permit doesn’t replace that approval. We supply the drawings and material specs architectural committees ask for.
Florida law requires pool barriers at least 48 inches tall with no gaps a child can crawl under, squeeze through or climb over. Gates must open away from the pool and be self-closing and self-latching. We build every pool fence to that code.
Fences can’t go in a conservation easement. Where a fence crosses a drainage easement, the city requires at least 4 inches between grade and the bottom of the fence so stormwater keeps flowing.
How It Works
The planning happens at the estimate, so installation day goes the way you expect.
Free
We walk your property, mark the line and talk through materials, gates and HOA rules.
No obligation
An itemized price with no vague ranges, plus the drawings and specs your HOA asks for.
We handle it
We handle the permit when one’s needed and lock in your install date.
Warranty-backed
Our crew builds it, cleans up, hauls the old fence away and walks the line with you.
Why All County
We handle permits when one’s needed
If your fence needs a city or county permit, we take care of it, so you never deal with the building department.
Written quote, no vague ranges
You’ll know exactly what you’re paying before work begins. No pressure. No surprises.
Old fence hauled away
Replacing a fence? We tear out the old one and take it with us.
We stand behind our work
Warranty repairs on the fences we build, from a crew that answers the phone.
★★★★★
John Murphy
Google · June 2026
★★★★★
Todd Jenkins
Google · June 2026
Pricing
Every yard is different, so every quote is itemized. These move the price most:
Length & height
Linear footage is the biggest driver, then height. Taller fences need more material and deeper posts.
Material & style
Chain link is the most economical; wood, vinyl and aluminum vary by style and finish.
Gates
Walk gates, double drive gates and pool-code hardware each add to the quote.
Removal & site access
Tearing out an old fence, tight side yards and slopes all affect labor.
Permits & HOA
Permit fees and HOA design rules are built into your written quote.
See installed prices by material in our Orlando fence cost guide.
Want a number tonight?
Trace your fence line on a map of your property, pick a material and see a ballpark price in about 60 seconds.
Current offerEnds Dec 31, 2026
Free Walk Gate ($500 value)
On any new fence installation over 100 linear feet in Ocoee.
Nearby
Questions
Yes. Ocoee requires a fence permit for new installations and for replacements, so swapping an old fence on the same line still needs one. The application includes a site plan showing location, length, height, gates and material, along with a notarized building permit application. We handle the permit and the city’s placement acknowledgment for you.
The City of Ocoee Building Division at City Hall, 1 N. Bluford Avenue, takes applications through the city’s online permit portal or in person. Zoning staff review fence placement before final review. If your property turns out to be in unincorporated Orange County rather than the city, the County’s Zoning Division handles the permit instead, under its own rules.
Yes. Westyn Bay, Wesmere and Remington Oaks are HOA or deed-restricted communities with standards for fence style, height and color, and HOA approval is a separate step from the city permit. We build to what your HOA allows and give you the drawings and material specs to submit for approval.
PVC vinyl privacy fences are a frequent choice in newer subdivisions. Aluminum suits pools, lake lots and 4-foot front-yard fences, and wood remains the budget privacy option. Chain link works for pets and larger back yards where an HOA allows it. Whatever the material, the fence still needs a city permit.
Not in a conservation easement, where the city doesn’t allow fences. A fence crossing a drainage easement must leave at least 4 inches between the ground and the bottom of the fence so water keeps moving. We check your survey for both before we lay out the line and show them on the permit site plan.
Yes. We come out, measure the line, check setbacks, corners and easements, and give you a written, itemized quote with no pressure. Ocoee fence installation usually follows about four weeks after you sign, mostly while materials are ordered, and we remove and haul away the old fence if you need it.
Free Estimate
Tell us about your yard and we’ll call to set up a time to measure. You get a written, itemized quote with no pressure.
Tell us about your fence
Only name and phone are required.